Context

A Geneva-based industrial SME was running its ERP, file shares and internal tools on three physical servers hosted in its premises. End-of-life hardware, manual backups, no tested recovery plan.

The goal: get out of the local datacentre without losing data sovereignty (Swiss hosting required), while laying the foundation for modern infrastructure management.

Work delivered

  • Full audit of the existing setup (load, dependencies, maintenance windows)
  • Choice of Infomaniak Public Cloud (OpenStack) for Swiss sovereignty
  • Target design: VPC, subnets, security groups, load balancers
  • Terraform code for the entire infrastructure (reusable modules)
  • Ansible provisioning of the VMs (hardening, monitoring, backups)
  • Migration in batches with planned windows (4 weekends)
  • Disaster recovery plan tested for real: full restore in under 2 hours

Outcome

  • 100% of the infrastructure described as code, versioned in GitLab
  • Infrastructure costs reduced by ~35% (vs. hardware amortisation + maintenance)
  • Encrypted, automated, weekly-verified backups
  • Internal team trained on Terraform and OpenStack basics (2-day training)

Stack

OpenStack · Terraform · Ansible · Prometheus · Grafana · GitLab CI · Restic